Automation Systems:
22 December 2016 17:45
Installation of GBS for a new power unit No. 12 of VTGRES

Globaltechexport Ltd. got positive feedback from Interenergo LLC upon installation of the gas booster station of a new CCGTU-420 MW power unit of Verkhnetagilskaya GRES. The companies’ collaboration at that phase included equipment engineering and supply.

06 December 2016 17:18
Positive feedback from Zarubezhenergoproekt

Zarubezhenergoproekt JSC highly appreciated the quality of the gas booster station design documentation prepared by Globaltechexport Ltd. for a new power unit of Verkhnetagilskaya GRES.

Automation System Design

Globaltechexport Ltd. offers automation system design both as an individual service and as a part of an integrated process automation project.

At this stage, the work is carried out under the technical design specifications for automation system design prepared during facility surveys and preparation of quotations for automated system implementation as approved by the Customer. Configuration of the future control system and its type (multi-level distribution system, or a local system) depends on the complexity of the facility, where it is implemented. It is determined by the required level of operation, control and adjustment, and also on the choice of process equipment.

Automation system design comprises the following stages:

  • Automation system design at the instrumentation and control level and field equipment level (preparation of circuit diagrams, selection of transmitter positions, their types and actuators; development of structural diagrams of automated facilities, schematic diagrams of control cabinets; preparation of external wiring diagrams and cabling routes);
  • Development of the automation system at the level of initial data processing, signals transmission to actuators (selection of controller types and configurations; development of automation system algorithms; and programming of controllers);
  • Development of the automation system at the level of operator’s workstation and industrial communication networks (workstations creation; LAN development; development of software applications for workstations; equipment selection for industrial servers and networks).

Documentation is prepared with reference to general regulations applicable in the Russian Federation, or in the country of residence for the Customer.

Final automation system project documentation package comprises the following sections:

  • General documentation on the system;
  • Technical documentation;
  • Software and hardware documentation;
  • Operating manuals.


Automation System Design (interaction scheme)